Skip to content
Interior painting project, completed

Interior painting

Substrates
Plaster, plasterboard, timber
Systems
Low-odour, low-VOC
Coats
Two as standard
Guarantee
5 years

What the work involves

Walls, ceilings and joinery finished to a standard that survives being lived in.

What's included

Preparation

  • Full make-good: filling, sanding, caulking
  • Plasterboard joints sealed before coating
  • Dust extraction at source, not sheeting alone

Finish

  • Two full coats as standard, more where needed
  • Low-odour, low-VOC systems for occupied homes
  • Bespoke colour matched and signed off on site

Handover

  • Rooms reinstated and cleaned each evening
  • Daylight walk-round with you at completion
  • Five-year guarantee on the finish

How the work runs

  1. 01

    Consultation

    We visit, look at the substrate, and tell you what it actually needs.

  2. 02

    Preparation

    Filling, sanding and sealing. The part you never see, and the part that lasts.

  3. 03

    Finish

    Coats applied to a schedule set by the substrate, not by the clock.

  4. 04

    Sign-off

    We walk it with you in daylight. Anything you spot, we put right.

The same four stages on every job, whichever discipline. More about how we work.