Thirty years of preparation, then paint.
Three decades decorating in the UK, brought to Dubai and the wider UAE. The climate changes everything about timing, and nothing about the standard.
Anyone can put paint on a wall. What you are paying for is everything that happens before the first coat.

- Founded
- 1994
- Operating
- Dubai and the UAE
- Projects
- 1,400+
- Finish guarantee
- 5 years
How we got here
- 1994
Founded in London, working on period residential.
- 2003
First specialist finishes team, plaster and limewash.
- 2011
Commercial division opens across the Home Counties.
- 2019
First Dubai project, a villa on Palm Jumeirah.
- 2026
Operating across the emirate, still family run.
Why Dubai changes the method
Heat, salt and humidity break coatings in specific, predictable ways. Thirty years of UK method still applies. What changes is the timing, and almost everything about the exterior specification.
- Substrate temperature
- Elevations are sequenced with the sun so no coat goes on to a hot wall. A film that skins before it has bonded looks right on the day and fails within a season.
- Drying windows
- Manufacturer figures assume a temperate climate. In high humidity we extend them well past the printed times and let the coat decide when it is ready, not the schedule.
- Breathable systems
- Salt air and trapped moisture blow a film from behind. Exterior work goes on in breathable silicate systems that let the wall dry outwards instead of sealing the problem in.
What we hold to
Spotless
Sheets up, dust extracted at source, the site left clean every evening. You should barely notice we were there.
Personal
The person who quotes the work is on site while it runs. No account managers, no handover to a crew you have never met.
Guaranteed
Five years on the finish. If something moves, lifts or fails, we come back and put it right.
The team



Names and portraits to be supplied by the client.